The James H. Brooks Field House is currently under construction and is expected to open in the fall of 2012. The Brooks Field House will be a two-story, 18,237-square-foot facility that provides classroom, locker room and meeting space for the E&H athletics program. Named in honor a former member of the E&H Board of Visitors, the field house represents the second stage of the two-stage development of the Fred Selfe Stadium.
Once completed, the facility will use a geothermal field for its heating and cooling and is expected to acquire LEED Silver certification from the U.S. Green Building Council. The architectural firm of Thompson & Litton designed the facility. Burwil Construction is the general contractor.
Below are pictures of the Field House Construction process.
